Market Survey: Design and Construction of Prefabricated Metal Storage Garage - Boise Air Traffic Control Tower (Gowen Field), Boise, ID
- Bid due
- Wed Oct 14, 2026
- Location
- Boise, ID
- Source
- SAM.gov
- Solicitation
- 697DCK-27-R-00025
- NAICS
- 236220
1. Introduction To support acquisition strategy development and assess commercial marketplace capabilities, the Federal Aviation Administration (FAA) is seeking interested sources capable of designing and constructing a finished pre-engineered metal storage garage at the Boise Air Traffic Control Tower (ATCT). This Market Survey is issued in accordance with FAA Acquisition Management System (AMS) Policy 3.2.1.2.1 to solicit statements of interest and capabilities. Estimated Project Value Range: $450,000.00 - $650,000.00 Place of Performance: Boise Air Traffic Control Tower (ATCT) / Gowen Field 2901 Ed Stimpson Way, Boise, ID 83642 2. Project Description & Scope of Work The Federal Aviation Administration (FAA), Mobile Asset Program, has a requirement to design and construct a finished pre-engineered metal storage garage (PEMB) at the Boise Air Traffic Control Tower (Gowen Field). The new facility will serve as an unstaffed equipment storage building to house and protect large mobile equipment trailers. Specific work items and technical parameters include: Building Structure & Dimensions: Design, fabricate, deliver, and erect a 53'-0" W x 90'-0" L x 18'-0" Eave Height (5,208 sq. ft.
Read the original notice · always confirm details there.