IDOT: This project is located on FAP 68 (IL-23) and FAS 370 (Long Point Rd). IL 23 begins at (Livingston County)
- Bid due
- Fri Nov 6, 2026, 12:00 PM CST
- Location
- Livingston County, IL
- Source
- Illinois DOT lettings (Transportation Bulletin)
- Solicitation
- Item-contract 065-66P69
IDOT letting item 065-66P69 (region 2, district 3): This project is located on FAP 68 (IL-23) and FAS 370 (Long Point Rd). IL 23 begins at the Vermillion River Bridge_south of Streator to ECL in Cornell. The work consists of HMA milling and resurfacing (SMART overlay), pavement marking, raised reflective markers, and ADA ramps. Long Point Rd begins from IL-23 to Main St in Long Point. The work consists of HMA milling and resurfacing (design overlay), pavment marking, raised reflective markers, and ADA ramps. Approximately 15.58 miles gross length. Bids due 12:00 PM Central on November 6, 2026; bidders must be prequalified and request authorization to bid before the cut-off on IDOT's letting schedule.
Read the original notice · always confirm details there.