Folly Beach Redundant Water Main - Prime Contractor Prequalification
- Bid due
- Wed Oct 14, 2026, 6:00 PM EDT
- Location
- SC
- Source
- SCBO (Construction)
This advertisement is for prequalification to work as the prime contractor for the upcoming Folly Beach Redundant Water Main project. The project work will include the installation of 1,200 linear feet of 12” ductile iron pipe installed with open cut, 10,300 linear feet of 16” high density polyethylene pipe (HPDE) through horizontal directional drill installation, and 150 linear feet of J&B installation between Sol Legare Road on James Island and East Indian Avenue in the City of Folly Beach. Location: James Island to The City of Folly Beach Delivery method: Design-Bid-Build Documents: [email protected] or [email protected] License requirement: WL5
Read the original notice · always confirm details there.