0days left
MUSC CSB 4th Floor Corridor Renovation
Medical University Hospital Authority (MUHA)
General Construction
- Bid due
- Thu Oct 15, 2026, 2:30 AM EDT
- Location
- Charleston, SC
- Source
- SCBO (Construction)
- Solicitation
- H51-P019
This project consists of an interior renovation of the 4th-floor corridor at the MUSC Clinical Science Building. The scope includes selective demolition and reconfiguration of existing spaces, along with new architectural finishes, ceilings, and flooring. Work also includes coordination with abatement contractor. Location: 96 Jonathan Lucas St. Charleston, SC 29425 Delivery method: Design-Build Documents: A&E Digital Printing License requirement: not stated
Read the original notice · always confirm details there.