101days left
North Dale Drive Drainage System Improvements
City of Easley
General Construction
- Bid due
- Thu Jan 28, 2027, 2:00 PM EST
- Location
- Easley, SC
- Source
- SCBO (Construction)
The project t includes the complete installation of 580 linear feet of 24” HDPE drain line. Included in this installation is 5 catch basins along with aprons to accept the stormwater runoff from the roadway section. The connection to the existing catch basin shall be at the southerly side of the entrance to the existing commercial use. As installation of the drain line progresses, it will be necessary to remove the existing line. Location: N Dale Dr, Easley, SC 29640 Delivery method: Other Documents: https://www.cityofeasley.com License requirement: not stated
Read the original notice · always confirm details there.