28days left
SC Data Center - Replace VAV Boxes and Controls
Department of Administration
General Construction
- Bid due
- Tue Nov 17, 2026, 2:00 PM EST
- Location
- SC
- Source
- SCBO (Construction)
- Solicitation
- D50-6161-LC
The project is a phased demolition and replacement of 53 VAV boxes on the 1st and 2nd floors of the SC Data Center. Limited ductwork for connections to the new VAV boxes. The existing JCI controls system is to be upgraded. Location: SC Data Center Delivery method: Design-Bid-Build Documents: [email protected] License requirement: Mechanical - AC
Read the original notice · always confirm details there.