Curltail Creek Sewer Rehabilitation
- Bid due
- Thu Nov 19, 2026, 3:00 PM EST
- Location
- Greenwood, SC
- Source
- SCBO (Construction)
Rehabilitation of approximately 8,315 feet of 8, 10, and 12 inch sewer via CIPP, an estimated 30+ service laterals, and 38 manholes. The sewers are to be lined with UV cured-in-place pipe (CIPP) lining. Work includes cleaning, televising existing sewers, installing CIPP lining in main sewers and laterals, rehabilitating manholes (frame/cover replacement, bench and invert re-builds, cementitious mortar coating, etc),…
Show the rest
making point repairs via excavation, by-pass pumping, and pavement restoration. Location: Greenwood, SC Delivery method: Design-Bid-Build Documents: Scott Rayack, [email protected] License requirement: not stated
Read the original notice · always confirm details there.