BidRep

All contracts › Illinois

34days left

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF
General Construction No Set aside used
Bid due
Tue Nov 17, 2026, 4:00 PM CST
Location
Batavia, IL
Source
SAM.gov
Solicitation
RFP-376508-CD
NAICS
236210

This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The Ge

Read the original notice · always confirm details there.

More open contracts: Construction · all of Illinois

Get the contracts that fit your business, every morning.
Tell BidRep your trades or services and where you work. Free to start, no card.
Start free