N045--Boiler 3 Oxygen Analyzer and Steam Flow Meter

VETERANS AFFAIRS, DEPARTMENT OF · VETERANS AFFAIRS, DEPARTMENT OF
HVAC / Plumbing Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Bid due
Mon Oct 26, 2026, 11:00 AM EDT
Location
Dublin, GA
Source
SAM.gov
Solicitation
36C24727Q0050
NAICS
238220

Questions and Answers 36C24727Q0050 Boiler #3 Oxygen Analyzer and Steam Flow Meter RFI Responses Where should the output signals from the new steam flow meter and O2 analyzer terminate? For example, the existing building automation system (BAS), the existing Boiler 3 burner/boiler controls, or a local display only. Burner 3 boiler/burner controls where applicable and local display. Does the government require active…

Show the rest

O2 trim control to the burner fuel/air ratio, or monitoring and display of the O2 only? Oxygen analyzer must send signals/information to combustion controls to control trim. What is the material of construction for the stack? Is it single or double wall? Stack is double walled. Inside material is steel; outside material is galvanized steel. Stack is 36 D Selkirk Metalbestos Model P.S. Current operating pressure and temperature of the system for boiler #3? Design pressure is 200 psi. Typical operating pressure is 82 psi. Typical operating temperature is about 330 degrees Fahrenheit. What are the available outputs on the physical steam flow meter (e.g., 4-20 mA, Modbus RTU, BACnet MS/TP)? 4-20 mA analog. Is the flow meter wired directly into an analog terminal block on th

Read the original notice · always confirm details there.

Similar open bids in Georgia

3days left

Dirt Street Paving Project

City of Waycross
Civil / Heavy
Bid due
Mon Oct 26, 2026, 2:00 PM EDT
Location
Waycross, GA
Source
City of Waycross bids

More open contracts: Construction · all of Georgia